The Lamprey River Project Committee is lead by chairman,
Travis Johnson, and is focussed on the section of river from
Wiswall Dam to the first railroad trestle downstream of Packers
Falls. The scope of this project is the same as the other river
projects, namely to establish a stewardship of the river for
better undestanding and to assist future projects on the rivers.
Recent
proposed changes to the fishing rules on the Isinglass river,
would now include a section of river that will be catch and
release only. This section from Wiswall Dam to the first railroad
trestle downstream of Packers Falls, will be open for catch
and release only, from Oct 16 - 4th Saturday in April.
Two of the most important aspects that need to be monitored
are water flow and water temperatures. These two factors play
an important role in determining what fish fish can be stocked
and how many, and what the potential for their survival is.
An excellent resource for this information is available at :
http://www.des.state.nh.us/wmb/VRAP/vrap.asp?theLink=Lamprey
As as this information is assimilated and compiled with geographic
information, a more complete assesment of the river can be achieved.
Lamprey Project Members:
Travis Johnson